Ingholt Consult had an important but difficult task on this project. There were problems with the 5 bearing  cores with cantilevered walls which not has the sufficient bearing capacity. Different solutions was asked, and Ingholt Consult came up with a drastic solution where the walls were thicker, many holes for doors  in the walls were closed and it was necessary with a post-tensioned solution to carry the very heavy cantilevered floors. In January 2016 the concrete walls were finally stressed on site and the school can now open up a safe stable school with 1200 children.